Edit Schedule
Schedule ID
15840
Schedule Type
Status
SW Store #
1165 W WINNECONNE AVE STE A
NEENAH, WI 54956 9999
(920) 729-5927
FCA Number
DAD Number
Facility Type
Equip. Ship Date
Wiring Install Date
Equip. Install Date
Turnkey / Order Date
Complete Date
Installer Date
WAN Install Date
WAN Install Type
Circuit Date
* 45 day lead time required
Start Downloads Date
Go Live Date
Initial Loads Date
POS Activation Goal
POS Activation Date
Tint Type
Open Date
Additional Equip.
Additional Equip. Options
Ci52:
MGR:
2
3
4
POS:
2
3
4
# Voice Runs
# Data Runs
# CCPC Runs
# Corp Runs
# Other Runs
# Other Runs Description
Attachments
No current attachments.
Comments
Mount cabinet (7) Data: #1- Main POS (At counter closest to office- under cabinet in Hubbell box) #2- Manager (Office Computer) #3- POS #2 (Second POS at counter- under cabinet in Hubbell box) #4- Tint (within Tint alcove #5-CC 1 (Main POS Location) #6-CC 2 (POS #2 Location) #7-Fax Data Run (Data Only Office) (2) EMS Runs (See Below EMS Requirements) EMS Requirements- An EMS data run is needed for each existing thermostat. Front EMS Run: Will need to be placed directly above the existing thermostat roughly 2ft above ceiling tile grid. Warehouse EMS Run: Will need to be terminated next to or on the existing HVAC unit to the Patch Panel. Please label these runs: EMS 1,2,3, etc…. FYI: In most cases there should only be 2 EMS runs needed, but there will sometimes be special cases where additional EMS runs are needed. No Phones No coax Total 9 Runs- (7) Data (2) EMS
Create Date
Created By
Update Date
Updated By
Main Menu
www.sherwin-williams.com
Privacy Statement
|
Legal Notice
|
Do Not Sell or Share My Personal Information
|
© 2026 The Sherwin-Williams Company