Edit Schedule
Schedule ID
14040
Schedule Type
Status
SW Store #
290 LARKIN DR STE 102
MONROE, NY 10950 4948
(845) 492-4523
FCA Number
DAD Number
Facility Type
Equip. Ship Date
Wiring Install Date
Equip. Install Date
Turnkey / Order Date
Complete Date
Installer Date
WAN Install Date
WAN Install Type
Circuit Date
* 45 day lead time required
Start Downloads Date
Go Live Date
Initial Loads Date
POS Activation Goal
POS Activation Date
Tint Type
Open Date
Additional Equip.
Additional Equip. Options
Ci52:
MGR:
2
3
4
POS:
2
3
4
# Voice Runs
# Data Runs
# CCPC Runs
# Corp Runs
# Other Runs
# Other Runs Description
Attachments
No current attachments.
Comments
Mount Cabinet (Please bring backboard) (6) Data: #1- Main POS (At counter closest to office- under cabinet in Hubbell box) #2- Manager (Office Computer) #3- POS #2 (Second POS at counter- under cabinet in Hubbell box) #4- Tint (within Tint alcove) #5-CC 1 (Main POS Location) #6-CC 2 (POS #2 Location) (4) Phones: POS Station 1 Drop 1- Line 1/2/3 POS Station 2 Drop 1-Line 1/2/3 Office Drop 1- Line 1/2/3 Office Drop 2- Fax (2) EMS Runs (See Below EMS Requirements) EMS Requirements- An EMS data run is needed for each existing thermostat. Front EMS Run: Will need to be placed directly above the existing thermostat roughly 2ft above ceiling tile grid. Warehouse EMS Run: Will need to be terminated next to or on the existing HVAC unit to the Patch Panel. Please label these runs: EMS 1,2,3, etc…. FYI: In most cases there should only be 2 EMS runs needed, but there will sometimes be special cases where additional EMS runs are needed. No Coax Cable Total 12 Runs (6) Data (4) Voice (2) EMS Two Technicians are approved for this project. Thanks Kesha Store confirmed live 11/24/17
Create Date
Created By
Update Date
Updated By
Main Menu
www.sherwin-williams.com
Privacy Statement
|
Legal Notice
|
Do Not Sell or Share My Personal Information
|
© 2026 The Sherwin-Williams Company